Treadmill Sampling Process — From Brief to Approved Sample

How treadmill sampling works at PRONEOFIT: brief, configuration, sample build, review, revision and approval — plus what decides the sampling timeline.

A sample is where a treadmill order either becomes concrete or falls apart. This page describes how we run sampling so both sides know what is being approved, and what the approval locks in.

Step 1 — Brief and configuration

We confirm the platform (folding, desk or walking pad), motor class, deck size, console, colour and packaging direction. You send artwork and any reference unit. Output: a written configuration sheet and a sample quotation.

Step 2 — Sample build

The sample is built on the agreed platform with your cosmetics. If the model already exists, the build uses current tooling. If the brief needs a new frame, console or colour, the tooling step is added and scheduled separately.

Step 3 — Review

You receive photos and a run video first, then the physical sample. Check the points that are expensive to change later: folded dimensions, console language, belt tracking, colour against Pantone, carton artwork and assembly steps.

Step 4 — Revision

Cosmetic revisions are usually quick. Platform changes — motor, deck, console hardware — restart part of the process and may affect the certification file. We flag this before the revision starts rather than after.

Step 5 — Approval and archive

Once approved, the sample specification, paint reference and artwork files are archived against your account. Production runs 30 days after approval, and reorders are built against the same archive.

What decides the timeline

FactorEffect on schedule
Existing platform, existing colourFastest path
New colour or new decalsAdds paint and artwork approval
New console or electronicsAdds electronics validation
New frame or folding mechanismAdds tooling and structural validation

Exact sampling days are confirmed per project — the schedule depends on the combination above. Send your brief and we will return a sampling plan with the quotation →