Quality Control — IQC, IPQC and OQC at Our Treadmill Factory
How PRONEOFIT controls treadmill quality: incoming inspection of motors and belts, in-process checks on welding and assembly, run-in testing and AQL outgoing audit.
Treadmill faults usually start before the unit is finished: a batch of controllers, a coating that failed to cure, a belt that tracks off-centre. Our quality system is arranged to catch those early, then verify the finished unit before it is packed.
Three gates
IQC — incoming quality control
Motors, controllers, belts, deck boards, rollers and fasteners are checked when they arrive. A failed lot is quarantined before it reaches the line. Records are kept by supplier and batch.
IPQC — in-process quality control
Checks run during production, not after it:
- Frame weld inspection and fixture alignment
- Coating thickness and colour against the approved reference
- Fastener torque at assembly stations
- Belt tracking and speed calibration after deck fitment
OQC — outgoing quality control
Every finished treadmill is powered and run before packing. The batch then passes an AQL sampling audit. Units that fail are pulled, the batch is re-inspected, and the inspection record is filed against the order.
What is checked on a finished unit
| Check | Method |
|---|---|
| Power-on and run | Powered run-in at working speed |
| Speed accuracy | Compared against console readout |
| Incline function | Full travel where fitted [VERIFY] |
| Belt tracking | Visual and adjustment check |
| Safety key / stop | Function test |
| Fold mechanism | Cycle test on folding models |
| Cosmetic finish | Visual against approved sample |
| Packing and accessories | Carton audit against packing list |
Specific test protocols and acceptance limits are documented per platform
and are marked [VERIFY] until the current QC file is attached.