Quality Control — IQC, IPQC and OQC at Our Treadmill Factory

How PRONEOFIT controls treadmill quality: incoming inspection of motors and belts, in-process checks on welding and assembly, run-in testing and AQL outgoing audit.

Treadmill faults usually start before the unit is finished: a batch of controllers, a coating that failed to cure, a belt that tracks off-centre. Our quality system is arranged to catch those early, then verify the finished unit before it is packed.

Three gates

IQC — incoming quality control

Motors, controllers, belts, deck boards, rollers and fasteners are checked when they arrive. A failed lot is quarantined before it reaches the line. Records are kept by supplier and batch.

IPQC — in-process quality control

Checks run during production, not after it:

  • Frame weld inspection and fixture alignment
  • Coating thickness and colour against the approved reference
  • Fastener torque at assembly stations
  • Belt tracking and speed calibration after deck fitment

OQC — outgoing quality control

Every finished treadmill is powered and run before packing. The batch then passes an AQL sampling audit. Units that fail are pulled, the batch is re-inspected, and the inspection record is filed against the order.

What is checked on a finished unit

CheckMethod
Power-on and runPowered run-in at working speed
Speed accuracyCompared against console readout
Incline functionFull travel where fitted [VERIFY]
Belt trackingVisual and adjustment check
Safety key / stopFunction test
Fold mechanismCycle test on folding models
Cosmetic finishVisual against approved sample
Packing and accessoriesCarton audit against packing list

Specific test protocols and acceptance limits are documented per platform and are marked [VERIFY] until the current QC file is attached.